Apr 27, 2023 | Bids, News
The Lapeer County Road Commission (CRC) has posted the bid items, on Bid Express, for the 2023 Primary Road HMA Overlay Program. Currently estimated at 21 miles, at various locations within Lapeer County. If interested in bidding, please visit www.bidexpress.com for...
Nov 29, 2022 | Bids, News
The Lapeer CRC has posted the bid items, on Bid Express, for the Lapeer CRC Parking Lot Rehabilitation Project at 820 Davis Lake Road. Project includes, but is not limited to, HMA Paving, Crushing and Shaping existing material, and Pavement Markings. Project is...
Oct 7, 2022 | Project Updates
The Traffic Count Program for the 2022 Season is completed. Daily Traffic Data has been updated for roads within Attica Township, Marathon Township, Mayfield Township and Deerfield Township. The Interactive Map along with letter size Pdf Township Maps have been...
Aug 24, 2022 | Project Updates
The Lapeer CRC Contractor will start milling operations along Stump Road, McCormick Road and Sawdust Corners Road, from Valentine Road northeasterly to Lapeer Road (M-24) this week. The removal of the existing asphalt in select locations is being done in preparation...
Aug 24, 2022 | Project Updates
Asphalt paving operations for placement of the top course are scheduled for the next two (2) days (Thursday August 25 – Friday August 26). Please continue to follow the detour or seek alternate routes for the safety of the construction crew. After the asphalt...
Aug 18, 2022 | Project Updates
Mill Road, from Dryden Village Limit northerly to Sutton Road, will be closed for Asphalt paving operations starting tomorrow, Friday, August 19, 2022. During Road Closure for paving, please follow the posted detour, or seek alternate routes for the safety of the...
Aug 4, 2022 | Project Updates
Average Daily Traffic (ADT) Counts will start in Deerfield Township on Monday, August 8, 2022. Data will be collected on all roads within the Township. It is expect to take about three (3) weeks to complete. Hoses will be placed across the roadway to count vehicles...
Jul 25, 2022 | Project Updates
The Dryden Road Contractor is starting the first lift of HMA Asphalt Paving today, Monday, July 25, 2022, on Dryden Road. The paving operation will start at Van Dyke Road (M-53) and work westerly along Dryden Road. This project includes two (2) lifts HMA Asphalt...
Jul 20, 2022 | Project Updates
Contractor to continue milling operations along Dryden Road. The milling operation started at the east end of the project (near M-53) and will continue working to the west (toward Metamora Village) at select milling locations. Once milling operations are complete,...